Following the recent solar distillation project, to bring some pure water to the resort development, July had another step forward. The installation of solar electric power for lights.
There was a problem with the camera on this trip, but as soon as the pictures and story are available the blog will be updated.
It is an exciting time at Isla Verde :-)
No comments:
Post a Comment